HI-TECH installed this anchored mesh system utilizing a high strength wire mesh and 12 foot deep rock anchors on 10 foot center to permanently mitigate the unstable slope.
HI-TECH built the largest Debris Flow Barrier known in the U.S. on Catalina Island in California to protect an elementary school from potential damage from mud and debris flows. This particular system was designed to mitigate flows of up to 400 cubic yards of material.
HI-TECH scaled the entire cliff face of this project to protect workers below from immediate dangers. This work was performed on 300 foot vertical walls and required our most highly trained personnel due to the overall size and scope of the project.
HI-TECH installed a hybrid cable lashing system on this project in Nevada to protect a water flume from damage. This project required special skills and heavy labor due to the limited access to the work site. This system will keep the lashed material in place on the rock cliff.