ODOT Emergency Scaling

Comments Off on ODOT Emergency Scaling

ODOT Emergency Blog

HI-TECH Rockfall was called out to Hwy 30 near the Stark Street Bridge to assist ODOT in assessing the rock slope after a large amount of material slid off the hill and closed the road. HI-TECH was able to respond within 12 hours with a qualified rock slope scaling crew and has since began removing more loose material and trees in order to make it safe to remove the material blocking the highway.

Tagged in Uncategorized

Comments are closed.

Copyright © 2020 Hi-Tech Rockfall Construction Inc. All Rights reserved.

Web Development by Typethink